Noyabrsk CCPP

Location:

Town of Noyabrsk, Yamalo-Nenetckiy Autonomous Area.

Technical characteristics:

  • Installed capacity: electrical — 122,6 MW, thermal — 95 Gcal/h
  • Fuel: gas
  • Power plant comprises 2 power units, 62 MW each
  • Each unit consists of:
    • 42 MW PG 6581 General Electric gas turbine;
    • HRSG (OJSC «ZIO-Podolsk»);
    • 20 MW steam cogeneration turbine (OJSC “Kaluga turbine plant»)

Works performed:

  • Prime Contractor
  • Owner’s Engineer functions; design of the electrical and heat power output schemes;
  • Supply of the main and auxiliary equipment, materials;
  • Construction and erection work;
  • Installation of the main and auxiliary equipment;
  • Commissioning operations and preparations for the Plant start-up, including the required tests, reliability run;
  • Training of the Customer personnel;
  • Plant start-up.

Links to press releases on the project:

November 19, 2010