Kurgan CHPP-2

Location:

Kurgan, Kurgan region.

Technical characteristics:

  • Installed capacity: electrical — 225 MW, thermal — 250 Gcal/h
  • Fuel: natural gas
  • The power plant consists of two power generating units, 111MW each. Each power generating unit includes:
    • 75MW General Electric PG 6111FA gas turbine;
    • Double pressure waste heat steam boiler (SES Tlmace)
    • 38MW Siemens SST-400 steam cogeneration turbine
  • Two peak hot water boilers will be installed in the power house.

Works performed:

  • General Designer/Prime Contractor
  • Design and survey work;
  • Designer supervision functions;
  • Supply of the main and auxiliary equipment, materials;
  • Construction and erection work;
  • Installation of the main and auxiliary equipment;
  • Commissioning operations and preparations for the Plant start-up, including the required tests, reliability run;
  • Training of the Customer personnel
  • Plant start-up.

Links to press releases on the project:

March 4, 2014