Modernization of Kirov CHPP-4

Location:

Kirov, Kirov region

Technical characteristics:

  • The scope of work performed by “Intertechelectro” includes the installation of a steam turbine, made by JSC “The Ural Turbine Works”, with a turbine generator, made by JSC “Research and Production Association “Elsib”, the installation of automated process control systems and an automated information and measuring system of commercial energy metering, the procurement of requisite auxiliary equipment as well as pre-commissioning and commissioning work

Works performed:

  • Prime Contractor
  • Installation of a steam turbine with a turbo-generator;
  • Installation of the DCS and AIMSEPFM;
  • Procurement of the required auxiliary equipment;
  • Commissioning operations and preparations for the Plant start-up, including the required tests, reliability run;
  • Plant start-up.

Links to press releases on the project:

April 23, 2014