CCGT unit of Kirov CHP-3

Location:

Kirovo-Chepetsk, Kirov region

Technical characteristics:

  • Installed capacity: electric - 220 MW, thermal - 136 Gcal/h
  • Fuel: natural
  • Equipment used:
    • 160MW GTE-160 gas turbine, made by JSC “Power machines
    • 60MW steam cogeneration turbine, made by CJSC “The Urals Turbine Works”
    • HRSG, made by JSC “EMAlliance”

Works performed:

  • Prime Contractor
  • Construction and erection work, including civil, special construction, assembly and dismantling operations;
  • Dismantling of the existing equipment, installations, buildings and structures as well as relocation of utility networks and equipment from the construction area;
  • Procurement, delivery, certification, Customs clearance of auxiliary equipment and materials;
  • Installation of the main and auxiliary equipment;
  • Commissioning operations and preparations for the Plant start-up;
  • ? Performance of tests, the Plant start-up, involvement in the power generating equipment qualification;
  • Training of the Customer personnel;
  • Work related to the Plant connection to the power grid, district heating, gas distribution, water supply and sewerage networks.

Links to press releases on the project:

July 31, 2014