Noyabrsk CCGT PP, 122,6 MW/95 Gcal/h

Installation of gas turbine units № 1 and 2 including:

  • General Electric gas turbine PG6581B
  • Generator BDAX7-290ERHN
  • Complete air inlet filter
  • Internal gas skid
  • External gas skid
  • Cooling system
  • Turbine fire fighting system
  • Turbine bundling pipes

Commissioning works and power units’ complete testing has been fulfilled, both the units have been put in commercial operation.

Kurgan CHP-2, 222 MW/250 Gcal/h

Installation of equipment of power units № 1 and 2 including:

  • General Electric gas turbine PG6111FA
  • Generator 6 FA
  • Complete air inlet filter
  • Gas oil module
  • Internal gas skid
  • Cooling system
  • Turbine fire fighting system
  • Turbine bundling pipes
  • Siemens steam turbine SST-400
  • Generator MKA10
  • Condenser MAG10 AC001
  • Intra-turbine piping

Priobskaya GTPP, 315 MW

Installation of gas turbine units № 1-7 including:

  • Siemens gas turbine SGT-800
  • Generator AMS 1250 A LF
  • Complete air inlet filter
  • Gas fuel shut-off devices module
  • Air cooling machinery
  • Turbine fire fighting system
  • Turbine bundling pipes

Commissioning works have been fulfilled. GT units №1,2,3 and 7 have been put in commercial operation, equipment is being installed on units № 4,5 and 6

Power unit №3 of Chelyabinsk CHP-3 220 MW/146 Gcal/h

Installation of equipment of power units № 3 including:

  • GTE-160 OJSC «LMZ» gas turbine (Siemens V-94.2 analogue)
  • Generator TZFG-160-2MUZ
  • Complete air inlet filter
  • Turbine bundling pipes
  • Т-50/70-6,8/0,12 steam turbine by OJSC «Kaluga turbine plant»
  • Generator TZFP-163-2MUZ
  • Condenser KP-3000
  • System water horizontal heaters, PSG-1400-0,3-1,6-1
  • Control system incl. shut-off and control valves
  • Intra-turbine piping